Campaign playbook
Choose a campaign to see the proposed rule changes, who can make them and examples from other places.
Here's how Prince Edward Island can unlock plug-in solar, every pathway below names a specific actor with the authority to act and the legal basis they would use.
Create a plug-in generation class for certified systems under 1200W with reduced permit and electrician requirements for cord-and-outlet connection only.
Create a plug-in generation category in Maritime Electric’s Net Metering for certified systems under 1200W. Exempt from engineering review, interconnection agreement, and meter upgrade.