Campaign playbook
Choose a campaign to see the proposed rule changes, who can make them and examples from other places.
Here's how Newfoundland and Labrador can unlock plug-in solar, every pathway below names a specific actor with the authority to act and the legal basis they would use.
Create a plug-in generation class for certified systems under 1200W with reduced permit and electrician requirements for cord-and-outlet connection.
Create a plug-in generation category exempt from standard net metering interconnection. Certified systems under 1200W connect via standard outlet without utility application or meter upgrade. On-site use only, anti-islanding required.